Road Management works table (FOI 10526)
The council's Road Management schedule showing the 2018 reconstruction and 2025 reseal across the bridge section.
| Produced by | Tipperary County Council |
|---|---|
| Date | obtained 2026 |
| Reference | FOI 10526, items 6 and 8 |
| Status | Held on file |
The lines that matter
- 2018 — Killardry — ch.1780–2480 — Road Reconstruction / Strengthening — Complete.
- 2025 — Kilmoyler to Kilmo… — ch.0–1802 — Resealing RSR — Complete.
- The Killardry section begins at chainage 1780; the 2025 reseal reached chainage 1802.
The council's own works schedule records two resurfacing campaigns across the bridge section. Each adds material and raises the road; the parapet was never raised to match.
Source: TCC Road Management system, FOI 10526 items 6 and 8. Held on file.